Reference — Implementation Roadmap

← tree index · source: §9 of recommendations doc

The v3 phasing: ship the highest-value behavioral changes first; let platform-internal infrastructure catch up in parallel. Sequencing rationale is “smallest change, largest behavioral payoff first.”

Phase 1 — Foundation (smallest changes, largest behavioral payoff)

Makes the platform produce evidence of application rather than just completion.

Phase 2 — Context layer

Phase-1 data gets valuable once framed by context. LA becomes a structured signal source.

Phase 3 — Platform Manager + automation

Higher-effort engineering; worth doing after 1+2 prove the cycle approach.

Phase 4 — Business + Content loop

Closes both loops (renewal with client, content with Content Creator). Depends on 1–3.


Run one workshop to align on the 6-stage cycle vocabulary: 1. Pin the 6 phases to a whiteboard. 2. For each phase, ask each of the 5 roles: “what’s the next behavior I expect, and what should happen if it doesn’t?” 3. Use the answers to draft the intervention layer rules. 4. Capture which phases are well-covered today and which aren’t — most gaps cluster in Practice and Apply, where the behavioral payoff lives.

Separately, run the Content Creator working session (the two forcing questions in content-creator-role) before Phase 4.


Blocking questions per phase

Phase Must-resolve first
1 cycle naming, application evidence, timer anchor
2 context override precedence, pulse outliers
3 nudge fatigue, briefing report
4 HubSpot sync contract, Content Creator session

Full data-model and integration unknowns: data & integration questions.